How Do You Prepare a House for These Inspections?
Preparation for a 4-point or wind mitigation inspection comes down to two things: physical access to the equipment and the attic, and documentation for work that has already been done. Inspectors report what they can observe; anything they cannot reach is usually recorded as unverified rather than assumed. A visit that stalls on a blocked hatch or a missing permit often becomes a second visit.
What needs to be reachable
- Electrical service panel. Clear a working space in front of it and unlock any enclosure.
- Attic hatch or scuttle. Move whatever is stacked under it and clear the closet shelf it usually hides above. Roof deck fasteners and roof-to-wall connections are generally verified from inside.
- Water heater. Including the data plate, which carries the information used to establish age.
- HVAC equipment. Both the indoor air handler or furnace and the outdoor unit, plus the data plates on each.
- Exterior elevations. Trim back vegetation blocking walls, windows, or the path around the house, and unlock gates.
- Crawl space or garage access, where applicable.
The published standard of practice for general home inspections is explicit that inspectors are not required to move personal items, furniture, or stored goods, and are not required to enter areas that are not readily accessible (ASHI Standard of Practice). Insurance inspections are narrower still. If it is buried, it will likely be reported as not observed.
Paperwork worth locating first
- Roof permit records and the roofing contract or invoice. These establish when the covering was installed far more reliably than appearance does.
- Permits for electrical, plumbing, or HVAC replacement.
- Product approval documentation for impact-rated windows, doors, or shutters, including any labels still on the units.
- Prior inspection reports, if a previous inspection was performed on the property.
- Receipts for repairs made after an earlier inspection, if this is a re-inspection.
Much of the permit record is held by the local building department, and retrieving it takes time. Start before the inspection is scheduled, not the morning of.
On the day
Turn on the utilities — water, power, and gas where applicable — because equipment that cannot be operated cannot be reported as operating. Confine pets. Expect the inspector to take a substantial number of photographs; images are part of the record for both inspection types, not an optional extra. Plan for roughly an hour or so on a straightforward house, longer where access is awkward or the roofline is complex.
What preparation cannot change
Some features are genuinely unverifiable: a finished cathedral ceiling with no attic above it, spray foam covering the sheathing, a roof structure that cannot be entered safely. No amount of tidying fixes that, and a competent inspector will say so rather than guess. Likewise, preparation does not change what a carrier concludes from the report — inspectors document, underwriters decide.
If you are also arranging a general home inspection for your own purposes, that is a separate engagement you arrange and pay for; the lender's appraisal does not cover it (HUD 92564-CN).